The Texas Instruments LM61460EVM Evaluation Module features a spread spectrum operation, high efficiency, and a controlled recovery from dropout.
Features
- Spread spectrum operation
- Controlled recover from dropout
- Low operating quiescent current
- High efficiency
- Low minimum on-time
- Adjustable rise time
Layout
Publié le: 2019-12-26
| Mis à jour le: 2024-02-19

