Texas Instruments TLC6C5716EVM Evaluation Module
Texas Instruments TLC6C5716EVM Evaluation Module is developed using the USB2ANY communication tool with the TLC65716EVM GUI. The TLC6C5716EVM GUI is designed to demonstrate the features of the TLC6C5716-Q1, an automotive full diagnostic RGB driver. Powered by either a micro-USB supply or a PC USB port, the TLC6C5716EVM offers a solution for automotive LED applications. These applications include automotive cluster indicators, HVAC panels, E-shifter indicators, local dimming displays, and ambient lighting.Features
- 16 Channel constant current LED driver
- LED Open/short diagnostics
- Open drain error feedback
PCB Layout
Publié le: 2018-09-21
| Mis à jour le: 2023-05-03
